Polyurethane Facade Installation Guide
The correct installation sequence on a facade, critical points and common mistakes — in eight steps.
With polyurethane facade elements the sequence is mandatory: if chemical (adhesive) and mechanical (screw) fixing are not used together, joints open over time with thermal movement. This guide gives the eight steps from surface preparation to the topcoat, each with its critical point. Silicone-based adhesive is never used.

Required Materials and Tools
• Fine-tooth hand saw or mitre saw
• PU-based mounting adhesive (NOT silicone)
• Screws of suitable length and a cordless driver
• Acrylic / exterior filler
• 180-220 grit abrasive
• System primer of the topcoat brand
• Elastic, UV-resistant facade paint
• Damp cloth (for squeeze-out)
• Scaffolding / safe working platform
Step-by-Step Application
- Yüzey hazırlığı — Uygulama yüzeyi toz, yağ, kir ve nemden arındırılır; gevşek sıva ve boya montaj öncesinde kazınır. Yüzey kuru ve sağlam olmalıdır.
- Ölçü ve kesim planı — Ölçü doğrama kasasından değil, sövenin oturacağı duvar yüzeyinden alınır. Malzeme yüksek yoğunluklu olduğu için maket bıçağı kesmez: ince dişli el testeresi veya gönye kesme makinesi kullanılır, köşe birleşimleri 45° gönye ile kesilir. Hatalı kesim boşluğu macunla kapatılırsa çatlama ve boya dökülmesi görülür.
- Kuru prova — Parçalar vidalanmadan önce yerine tutulur; aks hizası, gönye açısı ve ek yerlerinin birbirine oturması kontrol edilir.
- Yapıştırma (kimyasal) — Silikon bazlı yapıştırıcı YASAKTIR. PU esaslı montaj yapıştırıcısı kesintisiz hat halinde sürülür; yalnızca duvara basan yüzeye değil, yan yana ve üst üste gelen TÜM birleşim yerlerine de uygulanır. Taşan fazlalık kurumadan nemli bezle silinir. Normal şartlarda kürlenme yaklaşık 1 saattir; soğuk havada uzar.
- Vidalama (mekanik) — Yalnızca yapıştırıcıya güvenilmez. Dış mekânda parçalar birleşim noktalarından KARŞILIKLI vidalanır; böylece ek yerleri ısı ve rüzgârla açmaz. Vida başları malzemenin içine gömülür. 240 cm sütun gövdesi baş, orta ve son noktadan çift taraflı; başlık ve kaide her iki taraftan ikişer vida ile sabitlenir.
- Macun ve zımpara — Vida başları, ek yerleri ve kot farkları akrilik/dış cephe dolgu macunu ile hemzemin doldurulur. Kuruyunca 180-220 kum zımpara ile izler yok edilir.
- Astar — Boya öncesi TÜM yüzey 180-220 kum ile hafifçe matlaştırılıp temizlenir (kalıp ayırıcı kalıntısı boyayı iter). Astar bölgesel değil tüm yüzeye homojen atılır; aksi hâlde macunlu bölgelerde emicilik farkı ton/parlaklık izi bırakır. Astar, son kat boyanın markasının sistem astarı olmalıdır.
- Son kat boya — Dış cephede elastikiyeti yüksek, UV dayanımlı dış cephe boyası uygulanır. Kat sayısı ve katlar arası bekleme süresi seçilen boya sisteminin teknik föyüne göre belirlenir. Boyasız bırakılan yüzey UV etkisiyle sararır.
What to watch when working at height
Polyurethane elements are light enough to need no crane and can be handled on scaffolding by a single craftsman. Mechanical fixing is even more critical at height: because of wind load no screw may be skipped and joints must be cross-screwed. When long profiles are butted together, adhesive is always applied to the joint.
What changes with thermal movement and steel frames
In steel substructures, thermal expansion joints must be absorbed with elastic mastic, since metal flexes both vertically and horizontally. The mastic decouples the joint from the building so movement is not transferred to the polyurethane facade as hairline cracks. Concrete is never poured inside a column; where a load exists a steel frame carries it.
Common mistakes and their consequences
Skipping adhesive on the joint or omitting screws comes back as a crack at the joint. Using silicone-based adhesive leads to flexing and opening over time. Skipping or spot-applying primer causes peeling or tonal differences. An unpainted surface yellows. Water or moisture ingress from behind pushes the paint off; paint must not be renewed before the source is fixed.

Frequently Asked Questions
Can a polyurethane facade element be installed with adhesive only?
It should not. Outdoors, adhesive and screws are used together; cross-screwing at the joints prevents them opening with thermal movement and wind.
Which adhesive is used?
A PU-based mounting adhesive. Silicone-based adhesive is forbidden. Curing takes about one hour in normal conditions and longer in cold weather.
Which tool is needed for cutting?
The material is too dense for a utility knife. Use a fine-tooth hand saw or a mitre saw, with 45° mitres at corners.
How are screw heads covered?
Screw heads are sunk into the material, filled flush with acrylic/exterior filler and sanded with 180-220 grit once dry.
Is primer mandatory?
Yes. It secures adhesion against release-agent residue, and for warranty purposes it must be the system primer of the topcoat brand.
When is paint applied after installation?
After filling and sanding are complete and the surface is clean, a homogeneous primer is applied, then the topcoat following the waiting times in the paint system’s data sheet.