Sign In
Polure
Favorites

Polyurethane Column, Column Capital and Base Installation

Published: · Duration: 0:51 · Watch on YouTube

This video shows polyurethane column components and the stages of assembling them. The positioning of a fluted column shaft, a round base and an ornamented column capital is demonstrated in practice.

Scenes from the video

A round polyurethane column base is displayed horizontally by hand
The cross-section of a hollow round column base is shown from the front
A round base is lowered onto the floor in front of the column shaft
A large column shaft component with a flat rear surface is carried
A fluted white column shaft panel is introduced while held upright
A fluted shaft component is positioned vertically for installation
A long fluted column panel is carried diagonally to the installation area
A curved and fluted column cladding component is shown in close-up
A fluted shaft panel is aligned with the other component in an upright position
The vertical form of the assembled fluted column shaft is checked
A Corinthian ornamented column capital is held beside the fluted shaft
A column capital with acanthus leaves is displayed together with the shaft
The connection between the decorative capital and the fluted column shaft is examined
The column capital is lowered from the scaffold onto the upright shaft
A large decorative capital is carefully aligned on the shaft
The fitted column capital and fluted shaft are shown in place
The completed column displays a fluted shaft and an ornamented capital

Stay up to date with our new videos

Subscribe to our YouTube channel and follow our social media accounts so you never miss our production, application and installation videos.

Subscribe on YouTube
Polyurethane Column, Column Capital and Base… | Polure