Sign In
Polure
Favorites

Polyurethane Pilaster Column Capitals and Manufacturing Stages

Published: · Duration: 1:01 · Watch on YouTube

This video shows the workshop manufacturing stages of polyurethane pilaster column capitals. It includes joining the parts, securing decorative details, applying the surface coating, and inspecting the completed models.

Scenes from the video

The body panel of a pilaster column capital is aligned on the workbench
Assembly material is placed into an application gun at the production bench
Adhesive is applied to the edge of the polyurethane part to be joined
The decorative side piece is carefully fitted to the pilaster body
The long polyurethane profile is checked vertically before assembly
The stepped surface panel is secured to the pilaster column body
The upper section of the pilaster capital is secured
The decorative curved side detail is positioned along the body edge
The frame detail in the lower section is secured with a hand tool
The assembled pilaster column capital is processed on the workbench
The top view of the hollow pilaster body is examined
Pilaster column capitals at different stages are displayed in the workshop
The stepped frame and upper moulding details are shown in close-up
A surface coating is applied to the pilaster column capital by spraying
The completed product features symmetrical frame and moulding details
Two polyurethane pilaster column capitals stand side by side in the production area
An even spray coating is applied to the front of the product
Two large pilaster elements are placed on top of each other for inspection
The polyurethane sheet is shaped on the table of the production machine
The hollow pilaster body is moved through the production area

Stay up to date with our new videos

Subscribe to our YouTube channel and follow our social media accounts so you never miss our production, application and installation videos.

Subscribe on YouTube