Sign In
Polure
Favorites

Polure’s Success Story in Polyurethane Manufacturing

Published: · Duration: 0:27 · Watch on YouTube

This video shows polyurethane decorative column components being assembled over an architectural drawing. The alignment stages of the ornate column capital, fluted shaft and base are presented in close detail.

Scenes from the video

Decorative columns with Corinthian capitals are displayed over an architectural drawing
Column capital with fluted shaft segments positioned on project drawing
Hand bringing decorative column capital close to long fluted body piece
Capital piece being tested on top of held fluted shaft
An ornate column capital is manually aligned with a fluted shaft
Carved column capital seated at shaft end in technical drawing
Decorative capital and separate shaft section examined on project sheet
Column capital at top, fluted shaft piece waiting below
Hand moving short fluted piece toward bottom of column capital
A fluted column shaft is placed beneath the capital component
Upper shaft section brought near connection point beneath capital
Hand securing fluted upper piece at lower edge of capital
A decorative column with its capital and fluted shaft assembled is shown
Decorative upper section of column model standing vertically on sheet
Two fluted shaft sections positioned on drawing with gap between them
Lower shaft piece lifted by hand toward end of upper section
The shaft sections of the decorative column are positioned end to end over the drawing
Shaft sections brought into contact at joining line
The lower section of the fluted column shaft is positioned by hand
Extended fluted column shaft positioned along technical sheet

Stay up to date with our new videos

Subscribe to our YouTube channel and follow our social media accounts so you never miss our production, application and installation videos.

Subscribe on YouTube